PropertiesCityVision
Building

commercial_offices
https://www.winstonfield.com/wp-content/uploads/2021/12/ENTRANCE2.jpg
commercial_building

COMMERCIALCommercial
Office Building

DeveloperWinstonfield
AvailabilityNot Available
Area479 sq.m.
Luxury Furnished Office Building

Fully Furnished Luxurious Office Building in Limassol, located in a prime location near Maximos Plaza.

The commercial building has 3 fully operational Business Floors (ground floor, 1st and 2nd floor).

The commercial building was designed and covered in Aluminium composite panels of Class A quality, inside areas combine Italian ceramic tiles of Class A quality rectified and Spanish Marbles while the building lighting is also classified as Energy saving A.

Furthermore, the offices are fully furnished with excellent brand – new desks, libraries, leather chairs, vinyl high quality venetian blinds and Italian sofas.

Additionally, all areas are being monitored by a CCTV system, with the use of the latest technology Alarm security system, smoke, gas and fire detectors, security access panels for Entry and Exit Clock in Out Mechanism.

Moreover, the building uses Electric automated entry doors with programming options for access, IP telephony and PC’s access, unified WiFi system in all floors, structured and networking cabling.

True value
is in quality.

True value
is in quality

commercial_building
01
Floors
Italian ceramic tiles of Class A quality – rectified.
02
Windows
Aluminium Double lay energy efficient windows.
03
Walls
Building covered and designed with Aluminium composite panels of Class A quality.
04
Lights
External lighting (whole building), hidden LED stripe lightings.
05
Entry Doors
Electric automated entry doors with programming options for access.

ENERGY EFFICIENCYGlazing Systems

Windows, skylights, vents, and glass portions of doors helps to control solar heat loss and gains runway heading towards.

ENERGY EFFICIENCYVentilation

An energy recovery ven­ti­la­tion system provides con­trolled ven­ti­la­tion and minimizes energy loss change management inside.

ENERGY EFFICIENCYHeating and Cooling

Incor­po­rat­ing energy efficient measures into a build­ing’s heating and cooling system, into maintenance activities.

CONSTRUCTION PLANProject Development

2019

Phase 1

Project Initiation and conception

The design of the building that houses our offices started in 2019. We took advantage of the fact that we had at our disposal a plot of land in a very good location and so we built our offices in this area.

It should be noted that initially there was an old uninhabited house which was demolished.

Phase 2

Project planning and definition

When the first step was completed and we determined whether a project is worth undertaking, the Team started the project’s planning and CityVision Building was born.

This was the most critical step as it set the foundation of the entire project. We identified the timeline as well as the project’s goals from beginning to end. The budget should always be kept in mind as it is essential to be estimated, outlined, and approved, as at the end of the day it will establish if a project succeeds or fails.

[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

2021

Phase 3 and 4

Project Execution and Launch

At this stage, the planning and scoping of CityVision were put to the test. Reports of the continuous process allowed the different members of the team to keep tabs on each phase and allowed them to make necessary adjustments along the way.

Project Performance

The project performance phase is where we ensured that the project was running on schedule and within budget. Information is vital in order to make any ongoing adjustments.

The End

Project Close

This is the last phase that the project has led to. After many final tests and inspections CityVision was concluded within a year of construction. 

[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

CONTACTGET IN TOUCH
WITH US

WE WANT TO HEAR ABOUT IT

https://www.winstonfield.com/wp-content/uploads/2024/03/Full-Black-Latest.png
Unit 3, Block 3 Maximos Plaza Makariou Avenue III, 217, Limassol, 3105, Cyprus

Follow us:

GALLERY
CALL US
https://www.winstonfield.com/wp-content/uploads/2023/12/EU_2022_BadgeLogos-640x455.png

Winstonfield Ltd – © All rights Reserved. Cookies and Privacy Policy